Overview

SG Controls were engaged to install Radio Antennae, SCADA packs, Modem’s and HMI units, along with all other necessary power infrastructure at various Water Corp sites throughout the Wheatbelt and Esperance regions.

The projects involved strict adherence to Water Corp standards and were carried out on a Lump Sum basis.

Products used

  • NextG modem
  • SCADA pack RTU
  • YBS809-81 antenna

Profile

  • Lump sum projects installing new electrical/comms equipment at remote Water Corp sites
  • Supply of all ancillary equipment and materials
  • Conformance to Water Corp policies and standards including Rescue Plans

Scope of works

  • Installation of new radio antennae
  • New Modem Install and replacement of SCADA pack RTU
  • Install 2 off Weidmuller DC fuse terminals (ASK1 047456: DIN RAIL MOUNTING) with 2A fuse link and 2 off Terminals (Weidmuller SAK/35) as per drawing GO79-041-002-01A. Connect 24V DC from existing 24V DC power supply into new RTU and NextG modem using newly installed fuses. Provide labels
  • Replace an existing CL2 OIP with new Quick panel View 12 inch ES1221R. An existing 24V DC supply and interface cable to PLC can be reused. (May need to slightly widen the existing cut to fix new OIP)